We wired in the charge controllers today.
We installed a cable from the generator to the inverter. The inverter is very heavy and we ended up using a small come-a-long to lift it into place.
We wired up the panels to the panel combiners.
We finished installing all of the solar panels.
We assembled and installed the rails that hold the solar panels.
We built the frames for the solar panels and stood them up. We moved the batteries to the battery box.