    We wired in the charge controllers today.

  • July 13, 2022

    July 13, 2022

    We installed a cable from the generator to the inverter. The inverter is very heavy and we ended up using a small come-a-long to lift it into place.

  • July 12, 2022

    July 12, 2022

    We wired up the panels to the panel combiners.

  • July 11, 2022

    July 11, 2022

    We finished installing all of the solar panels.

  • July 10, 2022

    July 10, 2022

    We assembled and installed the rails that hold the solar panels.

  • July 8, 2022

    July 8, 2022

    We built the frames for the solar panels and stood them up. We moved the batteries to the battery box.

  • July 7, 2022

    July 7, 2022

    We fastened the 6×6 timbers to the threaded rod on the sonotubes and cut down the 130-year-old jack pine tree beside the brown shed.

  • July 6, 2022

    July 6, 2022

    We built a box for the 24 batteries.

  • July 5, 2022

    July 5, 2022

    We poured concrete into the tubes and installed threaded rod anchors and rebar.

  • July 4, 2022

    July 4, 2022

    We poured a slab to mount the battery box. We dug holes to install the sonotubes and big feet anchors.